Maintenance and Performance Study of Porous Asphalt in Northern Climates at the Randolph Park & Ride |
Materials, Maintenance |
asphalt, park and ride, maintenance |
2025-02 |
02 |
Final |
Advancing the Use of DWTR in Stormwater Treatment Features to Enhance Phosphorus Removal for Transportation Projects |
Environmental |
urban stormwater treatment; drinking water treatment residuals; phosphorus; phosphorus removal; sand filter; stormwater controls; BMPs |
2025-01 |
01 |
Final |
Vermont Smart Growth, Vehicle Miles Traveled, and Greenhouse Gas Research |
Planning |
Smart Growth, Vehicle Miles Traveled, Land Use Planning, Greenhouse Gas Emissions |
2024-04 |
04 |
Final |
Pavement Deterioration Models for Pavement Management: Final Report
Pavement Deterioration Models for Pavement Management: Appendix
|
Asset Management |
Pavement Management, Pavement Deterioration |
2024-03 |
03 |
Final |
Development of Cost-Effective Rapid-Setting Concrete for Improved Bridge Joint Performance
|
Materials |
Rapid Setting Concrete, Materials, Durability, Accelerated Bridge Construction |
2024-02 |
02 |
Final |
Vermont Agency of Transportation Research Program Communications Plan |
Research, Technology Transfer |
Research, Technology Transfer, Communications |
2024-01 |
01 |
Final |
Experimental Feature Work Plan 2018-R-3 Culvert Liners in Weathersfield and Woodford |
Experimental Feature |
Culvert, Spray-on Liner, Hydraulics |
2023-05 |
05 |
Final |
Radio-Frequency Identification (RFID) and Wireless Internet of Things (IoT) Technologies for Transportation Maintenance Operations and Asset Management
|
Asset Management |
Asset Management |
2023-04 |
04 |
Final |
Speeding Countermeasures Toolbox for Vermont
Speeding Countermeasures for Vermont: Final Report
|
Safety |
Speeding, Safety |
2023-03 |
03 |
Final |
Inter-Laboratory Study (ILS) of Bituminous Concrete Balanced Mix Design (BMD) Tests for Use on VTrans Projects
|
Materials |
Bituminous Concrete, Balanced Mix Design |
2023-02 |
02 |
Final |
Effectiveness of Rectangular Rapid Flashing Beacons (RRFBs) in Small and Rural Communities |
Highway Safety |
Bike/Ped, RRFBs |
2023-01 |
01 |
Final |
Value of VTrans Research: Qualitative and Quantitative Analysis |
Research |
Research, Valuation |
2022-06 |
06 |
Final |
Quantifying Correlations Between Pavement Conditions and Snow and Ice Control Costs |
Asset Management |
Snow & Ice Control, Pavement Conditions |
2022-05 |
05 |
Final |
Evaluation of Stripping Potential Tests for Bituminous Concrete |
Materials |
Asphalt Stripping, Binder |
2022-04 |
04 |
Final |
Dynamic Cone Penetrometer Analysis Appendix B (Zip File of DCP Data)
|
Materials |
DCP, Geotechnical |
2022-03 |
03 |
Final |
VT AOT 2022 Research Peer Exchange Report |
Research |
Research, Peer Exchange |
2022-02 |
02 |
Final |
Tire Derived Aggregate for Underdrain Applications |
Experimental Feature |
TDA, Drainage |
2022-01 |
01 |
Final |
Quantifying Correlations Between Winter Severity, Road Conditions, and VTrans' Snow and Ice Control Activities |
Asset Management |
Snow and Ice Control, Storm Severity |
2021-06 |
06 |
Final |
Improving Roadway Conservation Investments in Vermont: Developing a Prioritization Screen Framework for Reducing Road Wildlife Mortality and Improving Wildlife Movement through Bridges and Culverts |
Environmental |
Wildlife Mortality, Wildlife Movement |
2021-05 |
05 |
Final |
Investigation of Full Depth Reclamation (FDR) on Cavendish-Weathersfield Road |
Materials |
Full Depth Reclamation, Cement Reclaim |
2021-04 |
04 |
Final |
Reclaimed Stabilized Base: Stabilizing Agent Selection and Design |
Materials |
Reclaimed Stabilized Base, Asphalt Emulsion |
2021-03` |
03 |
Final |
Quantifying Gully Erosion and Potential for Sediment and Phosphorus Pollutions Reductions Achieved by Erosion Remediation Projects on Vermont's Roads - Appendices
|
Environment |
Erosion Mitigation, Culvert, Gully |
2021-02 |
02 |
Final |
Hydraulic Inspection Vehicle Explorer (HIVE) Culvert Upgrade |
Maintenance |
Culvert, HIVE, Inspection |
2021-01 |
01 |
Final |
Recycled Asphalt Shingles (RAS) in Town Gravel Roads |
Recycled Materials |
RAS, Recycled Materials |
2020-05 |
05 |
Final |
Evaluating Effectiveness of Floodplain Sites along the Lamoille Valley Rail Trail: A Blueprint for Future Rail-River Projects - Appendices
|
Environment |
Floodplains, Erosion, Rail Trail |
2020-04 |
04 |
Final |
Radio Frequency Identification (RFID) Technology for Transportation Signage Management |
Asset Management |
Asset Management, Data Collection |
2020-03 |
03 |
Final |
Implementation of Intelligent Compaction (IC) for Pavement Construction in Vermont |
Pavement |
Paving, Compaction |
2020-02 |
02 |
Final |
Calibration of the Highway Safety Manual Predictive Models for Rural Two-lane Roads for Vermont |
Safety |
Highway Safety Manual, Rural Roads |
2020-01 |
01 |
Final |
Reducing Wildlife Mortality on Roads in Vermont: Determining Relationships Between Structure Attributes and Wildlife Movement Frequency Through Bridges and Culverts to Improve Related Conservation Investments |
Environment |
Road Ecology, Wildlife Passage, Wildlife Crossing |
2019-15 |
15 |
Final |
Quantifying the Vulnerability of Vermont Bridges to Seismic Loading |
Structures |
Seismic, Vulnerability, Hazard |
2019-12 |
12 |
Final |
Big-R-Bridge Super-Cor Buried Metal Structural Plate Arch and Vist-A-Wall Mechanically Stabilized Earth Retaining System: Construction and Settlement Report |
Structures, Geotechnical |
Mechanically Stabilized Earth, Arch, Retaining Wall, Structures |
2019-11 |
11 |
Initial |
Maintenance and Performance Study of Porous Asphalt in Northern Climates at the Randolph Park & Ride |
Environment, Pavement |
Porous Pavement, Stormwater |
2019-10 |
10 |
Initial |
Assessment of Poly-Carb FlexoGrid Bridge Deck Overlay System |
Structures |
Bridge Deck Overlay, Membrane, Skid Resistance |
2019-09 |
9 |
Final |
Snow and Ice Control Performance Measurement: Comparing “Grip,” Traffic Speed Distributions and Safety Outcomes During Winter Storms |
Maintenance |
Winter Maintenance, Performance measurement, Grip, Safety |
2019-08 |
8 |
Final |
Assessment of the BDM Waterproofing Membrane System |
Structures |
Spray Membrane |
2019-07 |
7 |
Final |
Recycled Asphalt Shingles in Town Gravel Roads |
Recycled Materials |
RAS, Recycle |
2019-06 |
6 |
Initial |
Concrete Pay Factors Analysis |
Materials |
Pay Factor, Concrete, QA/QC |
2019-05 |
5 |
Final |
Assessment of the HAWK Crosswalk Traffic Signal |
Safety |
Pedestrian, Traffic Signal, Safety, Crosswalk, Hybrid Beacon |
2019-04 |
4 |
Final |
Hamburg Wheel Tracker Preliminary Data Analysis |
Materials |
Hamburg, Pavement, HMA, Asphalt, Pay Factor
|
2019-03 |
3 |
Final |
Identifying Sensitive Structural and Hydraulic Parameters in a Bridge-Stream Network Under Flood Conditions |
Structures, Hydraulics |
2D hydraulic modeling, Transient analysis, Extreme flood events, Bridge-river interactions, Bridge resiliency, Flood mitigation |
2019-02 |
2 |
Final |
Assessment of the Jahn Permeable Mortar System in a Historic Bridge Abutment Application |
Structures |
Historic Bridge Preservation, Stone Foundation, Abutment Repair, Covered Bridge, Masonry Mortar |
2019-01 |
1 |
Final |
Assessment of the Composite Arch Bridge |
Structures |
Composite Arch Bridge, Accelerated Bridge Construction, Structures |
2018-08 |
8 |
Final |
Assessment of Super-Slab, a Precast Concrete Bridge Approach Slab |
Structures |
Bridge Approach Slab, Precast Concrete |
2018-07 |
7 |
Final |
Assessment of the 40” Wide Paving Skid Box for Preventative Maintenance |
Pavements |
Preventative Maintenance, Paving, Rutting, Cracking |
2018-06 |
6 |
Final |
Pavement Marking Comparison Study - I-89 Liquid Markings |
Safety |
Pavement Markings, Utah Blend, Wet Reflective, Optics |
2018-05 |
5 |
Final |
Assessment of the Bridge Preservation LLC's BDM Waterproofing Membrane System |
Materials |
Membrane |
2013 |
1 |
Update |
2013 Pavement Marking Data Collection Summary |
Safety |
Pavement Marking |
2013 |
6 |
Update |
3M Stamark Polyurea, Liquid Pavement Marking Series 1200 in Grooved Pavement Surfaces, South Burlington, I-189 |
Safety |
Liquid Marking |
2007 |
|
Final |
3M Stamark Polyurea, Liquid Pavement Markings Series 1200 and 1000, Lyndon-Barton, I-91 |
Safety |
Liquid Marking |
2007 |
|
Final |
50-Gyration SuperPave Mix, Rochester-Granville, VT 100 |
Pavements |
SuperPave |
2006 |
|
Initial |
A Study of In Situ Pavement Material Properties Determined from FWD Testing |
Geotechnical |
FWD, Materials Properties |
2004 |
|
Final |
Acoustic Emission Monitoring of Prefabricated and Prestressed Reinforced Concrete Bridge Elements and Structures |
Structures |
Pre-stress Concrete, Acoustic Emissions, Quality Control |
2018-02 |
2 |
Final |
Activated Approach Flasher System |
Safety |
Activated Approach Flasher System |
2009 |
|
Final |
Aexcel Roadzilla (TM) Methyl Methacrylate Pavement Marking |
Safety |
Liquid Marking |
2014-15 |
15 |
Final |
Alternative Pavement Designs - Randolph Park and Ride |
Environment, Pavement |
Permeable Pavement, Stormwater |
2012 |
5 |
Initial |
Alternative Pavement Designs - Randolph Park and Ride |
Environment, Pavement |
Permeable Pavement, Stormwater |
2013 |
|
Update |
An Evaluation of Brifen Wire Rope Safety Fence |
Safety |
Safety Fence |
2013 |
|
Final |
An Evaluation of Dilemma Zone Protection Practices for Signalized Intersection Control published by UMass-Amherst |
Traffic |
Signalized Intersection Safety |
2009 |
|
Final |
An Evaluation of TYFO S Fibrwrap |
Structures |
Fibrwrap |
2013-05 |
5 |
Final |
An Investigation into Porous Concrete Pavements for Northern Communities |
Pavements, Environment |
Permeable Pavement, Stormwater |
2010 |
|
Final |
Asphalt Treated Permeable Base |
Pavements |
Permeable Base |
2013 |
9 |
Update |
Assessment of 40” Wide Paving Skid Box |
Pavements |
Paving Skid Box |
2013 |
5 |
Update |
Assessment of ASTM D 6690-12 Type II of Type IV Joint Sealers |
Pavements |
Joint Sealers |
2014 |
8 |
Update |
Assessment of Bridge Preservation LLC’s BDM Waterproofing Membrane System |
Materials |
Membrane |
2017 |
3 |
Update |
Assessment of Bridge Preservation LLC’s BDM Waterproofing Membrane System |
Materials |
Membrane |
2016 |
3 |
Update |
Assessment of Design Parameters and Construction Requirements for Full Depth Reclamation Projects with Cement |
Construction |
Full Depth Reclamation |
2015-05 |
5 |
Final |
Assessment of Detectable Warning Products |
Safety |
Detectable Warning Products |
2013 |
3 |
Update |
Assessment of Fiber Reinforced Polymer (FRP) Strips for Bridge Rehabilitation |
Structures |
Bridge Rehabilitation, Fiber Reinforced Polymer |
2017 |
9 |
Update |
Assessment of Jahn Permeable Mortar System in a Historic Bridge Abutment Application |
Structures |
Permeable Mortar |
2015 |
10 |
Initial |
Assessment of Mechanically Fastened Fiber Reinforced Polymer (MF-FRP) Strips for Extending Bridge Service Life |
Structures |
Fiber Reinforced Polymer |
2015 |
8 |
Initial |
Assessment of Poly-Carb Mark-163 Flexogrid Bridge Deck Overlay System |
Materials |
Bridge Deck Overlay |
2017 |
4 |
Update |
Assessment of Super-Slab, a Precast Concrete Slab in a Bridge Approach Application |
Materials |
Super-Slab, Bridge Approach |
2017 |
7 |
Update |
Assessment of TechCrete a Concrete Repair Material and Joint Sealant |
Pavements |
Concrete Repair, Joint Sealant |
2013 |
11 |
Update |
Assessment of the Composite Arch "Bridge in a Backpack" bridge system from Advanced Infrastructure Technologies (AIT) |
Structures |
Composite Arch Bridge |
2014 |
12 |
Initial |
Assessment of the Jahn Permeable Mortar System In a Historic Bridge Abutment Application |
Structures |
Permeable Mortar |
2017 |
5 |
Update |
Assessment of the Pedestrian Hybrid Beacon Crosswalk System (PHB) or High-Intensity Activated Crosswalk (HAWK) System |
Safety |
Crosswalk |
2017 |
8 |
Update |
Assessment of the Poly-Carb Flexogrid Bridge Deck Overlay System |
Materials |
Bridge Deck Overlay |
2013 |
2 |
Update |
Assessment of the Stirling Lloyd Eliminator Waterproofing Membrane System |
Materials |
Membrane |
2017 |
6 |
Update |
Assessment of Uretek Deep Injection Process |
Geotechnical |
Deep Injection Process |
2015 |
9 |
Update |
BASphalt, Hot Mix Asphalt for Patching and Cross-Ditch Patching |
Materials |
BASphalt, Patching |
2006 |
|
Final |
Berlin 2947(1) Pavement Marking Study US 302 Bike Lane Installations |
Safety |
Bike Lane, Tape Markings |
2016 |
1 |
Update |
Berlin 2947(1) Pavement Marking Study US 302 Initial Winter Season Inspection on the Bike Lane |
Safety |
Bike Lane, Tape Markings |
2016 |
2 |
Update |
Brifen Wire Rope Safety Fence |
Safety |
Safety Fence |
2006 |
|
Initial |
Cargill SafeLane® HDX Overlay |
Pavements |
Anti-Ice Overlay |
2014 |
4 |
Update |
Centerline Rumble Stripes - Cambridge, Vermont |
Safety |
Rumble Stripes |
2014 |
3 |
Update |
Changing Risk of Extreme Event Impacts on Vermont Transportation Infrastructure |
Structures |
Extereme Event Impacts |
2017 |
|
Final |
Cold in-Place Recycled Bituminous Pavement - Dorset - Danby |
Pavements |
Asphalt, Cold in-Place Recycle |
2015 |
4 |
Update |
Cold Weather Waterborne Paint with XSR |
Safety |
Liquid Marking |
2007 |
|
Final |
Cold Weather Waterborne Paint with XSR |
Safety |
Liquid Marking |
2006 |
|
Initial |
Cold-Recycled Bituminous Pavement, Chester-Springfield, VT 11 |
Pavements |
Asphalt, Cold in-Place Recycle |
2007 |
|
Final |
Cold-Recycled Bituminous Pavement, Derby-Charleston, VT 105 |
Pavements |
Asphalt, Cold in-Place Recycle |
2007 |
|
Final |
Cold-Recycled Bituminous Pavement, Troy-Newport, VT 105 |
Pavements |
Asphalt, Cold in-Place Recycle |
2007 |
|
Final |
Cost-Effective and Rapid Concrete Repair Techniques |
Operations and Maintenance |
Rapid Concrete Repair |
2017 |
|
Final |
Designing the All-in-One Vermont Transportation Survey |
Policy and Planning |
Transporation Survey |
2017 |
|
Final |
Detectable Warning Panel Evaluation |
Materials |
Warning Panel |
2006 |
|
Final |
Detection and Mitigation of Subsidence and Voids on Vermont Roadways: I-89 Hartford and US 7 Manchester, Vermont |
Geotechnical |
Subsidence, Voids |
2008 |
|
Final |
Development and Implementation of Early Detection Systems for Ground Movement |
Geotechnical |
Ground Movement |
2008 |
|
Final |
Dynamic Striping in Four Towns along Vermont Route 30 |
Traffic |
Dynamic Striping |
2007 |
|
Final |
Dynamic Striping in Four Towns along Vermont Route 30 |
Traffic |
Dynamic Striping |
2005 |
|
Initial |
Effects of Highway Road Salting on the Water Quality of Selected Streams in Chittenden County, Vermont |
Environment |
Water Quality |
2010 |
|
Final |
Efficiency in Transportation - Community and State Transportation Efficiency Planning in Vermont |
Policy and Planning |
Transportation Efficency |
2012-03 |
3 |
Final |
Efficiency in Transportation - Increasing Carpooling in Vermont Alternatives to Single Occupancy Vehicle |
Policy and Planning |
Transporation Efficency |
2012-02 |
2 |
Final |
Efficiency in Transportation - Optimal Transit Networks For Vermont |
Policy and Planning |
Transporation Efficency |
2012-01 |
1 |
Final |
Employee Retention and Knowledge Management Study |
Administration |
Workforce, Retention |
2018-01 |
1 |
Final |
Ennis Paint, Inc. Tyregrip High Friction Surface System |
Safety |
High Friction Surface System |
2014 |
2 |
Update |
Epoplex Glomarc 90 Polyurea Pavement Marking |
Safety |
Liquid Marking |
2015-02 |
2 |
Final |
Epoplex Glomarc 90 Polyurea Pavement Marking – Initial |
Safety |
Liquid Marking |
2014 |
6 |
Initial |
Epoplex LS 90 Polyurea Pavement Marking |
Safety |
Liquid Marking |
2007 |
|
Final |
Evaluation and Comparison of Epoplex LS-50 Epoxy, Lyndon/Sheffield, I-91 |
Safety |
Liquid Marking |
2007 |
|
Final |
Evaluation and Comparison of Snowplowable Raised Pavement Markings (SRPM), Waterbury-Bolton, I-89 |
Safety |
Liquid Marking |
2007 |
|
Final |
Evaluation of 3M Stamark High Performance Wet Reflective Tape Series 380W ES Durable Tape |
Safety |
Tape Marking |
2011-02 |
2 |
Final |
Evaluation of 3M(tm) Stamark All Weather Liquid Pavement Marking Series 1400 |
Safety |
Liquid Marking |
2012 |
|
Final |
Evaluation of ATM 300 Permanent Durable Tape |
Safety |
Tape Marking |
2007 |
|
Initial |
Evaluation of ATM 300 Permanent Durable Tape |
Safety |
Tape Marking |
2010 |
|
Final |
Evaluation of ATM 400 Permanent Durable Tape |
Safety |
Tape Marking |
2010 |
|
Final |
Evaluation of ATM 400 Permanent Durable Tape |
Safety |
Tape Marking |
2007 |
|
Initial |
Evaluation of BlinkerSign Crosswalk Lighting System |
Safety |
Crosswalk |
2014 |
13 |
Update |
Evaluation of Bridge Performance and Rating through Non-Destructive Load Testing |
Structures |
Bridge Performance |
2009 |
|
Final |
Evaluation of Concrete Bridge Mix Designs for Control of Cracking, Phase I |
Structures |
Concrete Bridge Mix Design |
2014-09 |
9 |
Final |
Evaluation of Concrete Bridge Rail Cracking |
Structures |
Concrete Bridge |
2009 |
|
Initial |
Evaluation of Corrosion Resistance of Various Concrete Reinforcing Materials |
Structures |
Corrosion Resistance |
2013-07 |
7 |
Final |
Evaluation of Crown Technology’s Tuffline Hydrocarbon Thermoplastic |
Safety |
Hydrocarbon Thermnoplastic |
2005 |
|
Update |
Evaluation of Hybrid Rockfall Barrier/Drape System |
Geotechnical |
Hybrid Rockfall Barrier/Drape System |
2011 |
|
Initial |
Evaluation of Load Characteristics of I-89 Bridge 58N, Richmond |
Structures |
Bridge Load Characteristics |
2015 |
|
Final |
Evaluation of Measuring Methods for Traffic Sign Retroreflectivity |
Safety |
Traffic Sign Retroreflectivity |
2009 |
|
Final |
Evaluation of SmartStudTM In-Pavement Crosswalk Lighting System and Blinkersign® |
Safety |
Crosswalk |
2011 |
|
Update |
Evaluation of SPT Hammer Energy Variability |
Geotechnical |
Hammer Energy |
2010 |
|
Final |
Evaluation of the Effectiveness of Centerline Rumble Stripes on Rural Roads |
Safety |
Rumble Stripes |
2015 |
7 |
Update |
Evaluation of Ultra Hydrophast with Rhoplex Fastrack HD-21A |
Safety |
Liquid Marking |
2007 |
|
Initial |
Evaluation of Ultra Hydrophast with Rhoplex Fastrack HD-21A |
Safety |
Liquid Marking |
2009 |
|
Final |
Evaluation of Ultraliner PVC Alloy Pipeliner |
Structures |
Culvert Lining |
2013 |
13 |
Update |
Examining the Potential Impacts of Maintenance Investment and Capital Reinvestment In Vermont’s Roadway Infrastructure Network |
Policy and Planning |
Mainintenance Investment, Capital Reinvestment |
2017 |
|
Final |
Exploring Transportation Behaviors and Needs of Veterans and People with Physical Disabilities and Mobility Constraints |
Transit |
Transporation Behaviors |
2017 |
|
Final |
Forest Dale Masonry Wall and Slide Repair with Soil Nails and Rock Dowels |
Geotechnical |
Masonry Wall and Slide Repair |
2003 |
|
Final |
Foster Geotechnical Retained-Earth, Mechanically-Stabilized Abutment Wall |
Geotechnical |
Retaining Wall |
2004 |
|
Initial |
Full-Scale Pilot Study to Reduce Lateral Stresses in Retaining Structures Using GeoFoam published by UMass-Amherst |
Geotechnical |
Retaining Structures |
2009 |
|
Final |
Galvashield XP Sacrificial Anodes |
Structures |
Sacrificial Anodes |
2003 |
|
Initial |
GlasGrid Pavement Reinforcement System, Charleston and Barnet, Vermont |
Pavements |
Pavement Reinforcement |
2008 |
|
Final |
Gyration SuperPave Rochester-Granville |
Pavements |
SuperPave |
2014 |
2 |
Update |
Harvesting Data from Advanced Technologies |
Traffic |
Advanced Technologies |
2014-11 |
11 |
Final |
High Speed Ground Penetrating Radar for Road Pavement and Bridge Structural Inspection and Maintenance |
Operations and Maintenance |
Ground Penetraining Radar |
2016 |
|
Final |
Identifying Performance Based Measures for Winter Maintenance |
Operations and Maintenance |
Winter Maintenance |
2013 |
|
Update |
Impacts of Studded Tires on Pavement and Associated Socioeconomics |
Policy and Planning |
Studded Tires |
2011 |
|
Final |
Improving Transportation Mobility, Safety, and Efficiency: Guidelines for Planning and Deploying Traffic Signal Priority Strategies published by UMass-Amherst |
Transit |
Transporation Mobility |
2008 |
|
Final |
Insituform Pipe Lining Process, Richmond, Bridport, and Addison |
Structures |
Pipe Lining |
2007 |
|
Final |
Investigation of Alkali-Silica Reactivity in Portland Cement Concrete |
Materials |
Concrete, ASR |
2003 |
|
|
Investigation of Alkali-Silica Reactivity in Portland Cement Concrete |
Materials |
Concrete, ASR |
2008 |
|
Final |
Investigation of the Local Hydrology of a Porous Concrete Site |
Pavements |
Permeable Pavement, Stormwater |
2013 |
10 |
Update |
Laboratory and Field Evaluations of Pervious Concrete |
Pavements |
Permeable Pavement, Stormwater |
2013-14 |
14 |
Final |
Laboratory Freeze-thaw Durability of Pervious Concrete with Respect to Curing Time and Addition of Sand, Slag, Silica Fume, and Saltguard |
Pavements |
Permeable Pavement, Stormwater |
2017 |
|
Final |
Long-Term & Short-Term Measures of Roadway Snow and Ice Control Performance |
Operations and Maintenance |
Snow and Ice |
2016 |
|
Final |
Muddy Roads |
Geotechnical |
Muddy Roads |
2005 |
|
Final |
Non-Nuclear Compaction Gauge Comparison Study |
Geotechnical |
Compaction Gauge |
2008 |
|
Final |
Optimization of Snow Removal in Vermont |
Operations and Maintenance |
Snow Removal |
2013 |
12 |
Update |
Passenger Vehicle Idling in Vermont - Year 1 Report |
Policy and Planning |
Vehicle Idling |
2013 |
8 |
Update |
Pavement Condition Study |
Policy and Planning |
Public Feedback, Pavement Condition, Data Collection App, Public Outreach Survey Methods, Performance Measures, Performance Management, Customer Service |
2018-04 |
4 |
Final |
Pavement and Annualized Cost Study, Statewide |
Pavements |
Pavement Cost |
2010 |
|
Update |
Pavement Marking Durability |
Safety |
Pavement Marking |
2005 |
|
Update |
Pavement Marking Comparison Study - US Route 302 Bike Lane Markings |
Safety |
Pavement Marking |
2018-03 |
3 |
Final |
Pavement Marking Durability – Statewide |
Safety |
Pavement Marking |
2007 |
|
Final |
PavePrep Crack Reduction Interlayer, Lowell, Highgate and Hartford, Vermont |
Pavements |
PavePrep |
2008 |
|
Final |
Pedestrian Hybrid Beacon Crosswalk System (PHB) or High-Intensity Activated Crosswalk (HAWK) |
Structures |
Crosswalk |
2014 |
10 |
Update |
Performance Grade Asphalt Cement |
Pavements |
Asphalt |
2006 |
|
Final |
Performance Monitoring of Jointless Bridges – Phase III |
Structures |
Jointless Bridges |
2014-07 |
7 |
Final |
Performance Monitoring of Jointless Bridges – Phase III |
Structures |
Jointless Bridges |
2011 |
|
Update |
Performance of Brookfield RAS Surface Aggregate Blend |
Pavements |
Recycled Materials, RAS |
2017 |
1 |
Update |
Permeability of Highway Base and Sub-base Material |
Geotechnical |
Permeable Base |
1997 |
|
Final |
Prediction and Mitigation of Scour and Scour Damage to Vermont Bridges |
Structures |
Scour |
2017 |
|
Final |
Preventative Maintenance Treatments |
Pavements |
Preventative Maintenance |
2017-01 |
1 |
Final |
Quantification of Shape, Angularity, and Surface Texture of Base Course Materials |
Materials |
Aggregate |
1998 |
|
Initial |
Recessed and Surface-Applied Polyurea Pavement Markings |
Safety |
Pavement Marking |
2005 |
|
Update |
Reclaimed Base Course Stabilized with Calcium Chloride, Brandon-Goshen, VT Route 73 |
Pavements |
Reclaimed Stabilized Base |
2008 |
|
Final |
Reclaimed Stabilized Base with Cement, Moretown-Duxbury, VT Route 100 |
Pavements |
Reclaimed Stabilized Base |
2009 |
|
Update |
ReCon Mechanical Stabilized Earth Retaining Wall System |
Geotechnical |
Retaining Wall |
2015 |
|
Initial |
Redi-Rock Retaining Wall System |
Geotechnical |
Retaining Wall |
2006 |
|
Final |
Redi-Rock Retaining Wall System with Geogrid |
Geotechnical |
Retaining Wall |
2007 |
|
Final |
Reducing Emissions from Diesel Vehicles and Equipment: A VTrans Demonstration |
Environment |
Diesel Emissions |
2008 |
|
Final |
Reinforced Earth® Mechanically-Stabilized Earth Abutment Walls, US7, Wallingford |
Geotechnical |
Retaining Wall |
1998 |
|
Initial |
Renegotiation of Highway Construction Contracts: An Economic Analysis of Change Orders issued by the Vermont Agency of Transportation, 2004-2009 |
Policy and Planning |
Construction Contracts |
2013 |
|
Update |
Rockfall Hazard Rating of Rock Cuts on U.S. and State Highways in Vermont |
Geotechnical |
Rockfall |
2007 |
|
Final |
Salt Brine Salt Brine Blends and Application Technologies During The 2008 - 2009 Winter Maintenance Season |
Operations and Maintenance |
Winter Maintenance |
2009 |
|
Final |
Shared Use Path Barrier Usage Guideline published by UMass Dartmouth |
Safety |
Path Barrier |
2007 |
|
Final |
Shared Use Path Fencing Usage published by UMass Dartmouth |
Safety |
Path Fencing |
2007 |
|
Final |
SmartStud In-Pavement Crosswalk Lighting System |
Safety |
Crosswalk |
2006 |
|
Initial |
Snowplowable Raised Pavement Markings |
Safety |
Pavement Marking |
2006 |
|
Update |
Statewide Analysis of Guardrails, Curves and Crashes Published by The University of Vermont |
Safety |
Guardrails |
2016 |
|
Final |
Statistical Analysis of Weigh-in-Motion Data for Bridge Design in Vermont |
Structures |
Weigh-in-Motion |
2014-14 |
14 |
Final |
Stormwater Practices Research Project |
Environment |
Stormwater |
2012 |
|
Final |
Strategic Location of Satellite Salt Storage for Roadway Snow and Ice Control in Vermont |
Operations and Maintenance |
Snow and Ice |
2015 |
1 |
Update |
Study of In Situ Pavement Material Properties Determined from FWD Testing |
Pavements |
Pavement Material Properties |
2004 |
|
Final |
Suitability of Intelligent Compaction for Relatively Smaller-Scale Projects in Vermont |
Construction |
Intellegent Compaction |
2017 |
|
Final |
Synthesis of Technical Information for Jointless Bridge Construction |
Structures |
Jointless Bridges |
2002 |
|
Update |
Tensar Mesa Retaining Wall System |
Geotechnical |
Retaining Wall |
2006 |
|
Final |
Terminal Blend Asphalt Rubber Hot Mix Lowell-Westfield, VT Route 100 |
Pavements |
Asphalt |
2008 |
|
Final |
The Effect of Aggregate Angularity on Base Course Performance |
Materials |
Base Course |
2001 |
|
Update |
Thermal-Imaging of Applied Bituminous Pavement Statewide Projects |
Pavements |
Bituminous Pavement |
2006 |
|
Update |
Travel Importance and Strategic Investment in Vermont’s Transportation Assets |
Policy and Planning |
Transportation Assets |
2014-01 |
1 |
Final |
Using Remote Data Collection to Identify Bridges and Culverts Susceptible to Blockage During Flooding Events |
Operations and Maintenance |
Remote Data Collection |
2016 |
|
Final |
Utilization of Ground Penetrating Radar (GPR) to Detect Shear Bolts in Bridges |
Operations and Maintenance |
Ground Penetraining Radar |
2017 |
2 |
Update |
Verification of Abutment and Retaining Wall Design Assumptions |
Geotechnical, Structures |
Retaining Wall |
2015-06 |
6 |
Final |
Vermont Trip Generation Manual |
Traffic |
Trip Generation Manual |
2010 |
|
Final |
Wavetronix Smart Sensor Matrix |
Safety |
Wavetronix, Radar Sensor |
2015-13 |
13 |
Final |
Wavetronix SmartSensor Matrix Radar Stop Bar Detection |
Safety |
Wavetronix, Radar Sensor |
2013 |
4 |
Update |
Westfall Fiberglass Bridge Drain Pipe System, South Burlington, I-89 |
Structures |
Fiberglass Drain |
2007 |
|
Initial |
Westfall Fiberglass Bridge Drain System |
Structures |
Fiberglass Drain |
2013 |
|
Final |
Work Zones and Travel Speeds |
Construction |
Work Zone |
2014-05 |
5 |
Final
|