- Design, Bid, Build (Traditional Bid Process)
- CMGC – Construction Manager General Contractor
- Design – Build
- Design, Build, Own, Operate and Maintain
- Contractor Input During Design
Design, Bid, Build (Traditional Bid Process)
Click here for Historical Data
Bids received will be posted to this location as soon as possible after the 11:00 am Bid Opening.
Detail Bid result report will be posted after preliminary review when more than one Bid is received.
If only One Bid received, the Low Bid Contractor Name and Bid Amount will be posted in this location.
Full details will be posted when Contract is Awarded.
Contract Number
|
Construction contract |
Bid Opening |
DETAIL BID RESULTS |
Award date Awarded contractor |
Executed date |
---|---|---|---|---|---|
C03211 | PLYMOUTH ER P23-1 (317) | 1/17/25 | Detail Bid Report | TBD | TBD |
C03208 | WATERFORD IM 093-1 (14) | 1/17/25 | Detail Bid Report | TBD | TBD |
C03099 | SPRINGFIELD BF 0134 (49) (RE-AD) | 12/20/24 | Detail Bid Report |
1/9/25 Kubricky-Jointa Lime LLC |
TBD |
C03209 | LOWELL STP CULV (65) | 12/13/24 | Detail Bid Report |
1/9/25 J. A. McDonald, Inc.
|
TBD |
C03163 | BARRE TOWN-ORANGE STP PS23 (1) & ORANGE-TOPSHAM STP FPAV (56) | 12/13/24 | Detail Bid Report | J.Hutchins, Inc. | 1/10/2025 |
C03195 | ST. ALBANS-RICHFORD STP MVRT (1)(RE-AD) | 11/15/24 | Detail Bid Report |
12/9/24 S. D. Ireland Brothers Corporation |
1/2/25 |
CMGC – Construction Manager General Contractor
Construction contract |
Contractor |
Award Amount |
Award Date |
Executed date |
---|---|---|---|---|
Springfield IM091-3(83) CMGC RFP | TBD | TBD |
TBD |
TBD |
Design – Build/ Progressive Design Build
Construction Contract | Contractor | Award Amount | Award Date |
---|---|---|---|
Lyndon IM091-3(53) PDB- RFP | TBD | TBD | TBD |
Lyndon IM091-3(53)- DB- RFP | Cancelled 1.18.2024 | Cancelled- 1.18.2024 | Cancelled-1.18.2024 |
Lyndon IM91-3(53)- DB- RFQ |
Engineers Construction, INC. J.A McDonald Inc. |
N/A | 12/22/2022 |
Design, Build, Own, Operate and Maintain
Construction Contract | Contractor | Award Amount | Award Date |
---|---|---|---|
Statewide National Electric Vehicle Infrastructure (NEVI) RFP | Award Notification | Please see award notification | Please see award notification |
Statewide National Electric Vehicle Infrastructure (NEVI)_ RFQ | Shortlist Notification | N/A | 06/05/2024 |
Contractor Input During Design
Construction Contract | Contractor | Award Amount | Award Date |
---|---|---|---|
Chester BO 1442(39) | Shortlist Notification | N/A | 05/08/2024 |