Construction Contracting - Bid Results and Awards


Design, Bid, Build (Traditional Bid Process)

Click here for Historical Data

Bids received will be posted to this location as soon as possible after the 11:00 am Bid Opening.

Detail Bid result report will be posted after preliminary review when more than one Bid is received.

If only One Bid received, the Low Bid Contractor Name and Bid Amount will be posted in this location.

Full details will be posted when Contract is Awarded.

 

Contract

Number

 

Construction contract

Bid Opening
date

DETAIL BID RESULTS

Award date

Awarded contractor

Executed date

C03211 PLYMOUTH ER P23-1 (317) 1/17/25 Detail Bid Report TBD TBD
C03208 WATERFORD IM 093-1 (14) 1/17/25 Detail Bid Report TBD TBD
C03099 SPRINGFIELD BF 0134 (49) (RE-AD) 12/20/24 Detail Bid Report

1/9/25

Kubricky-Jointa Lime LLC

TBD
C03209 LOWELL STP CULV (65) 12/13/24 Detail Bid Report

1/9/25

J. A. McDonald, Inc.

 

TBD
C03163 BARRE TOWN-ORANGE STP PS23 (1) & ORANGE-TOPSHAM STP FPAV (56) 12/13/24 Detail Bid Report J.Hutchins, Inc.  1/10/2025
C03195 ST. ALBANS-RICHFORD STP MVRT (1)(RE-AD) 11/15/24 Detail Bid Report

12/9/24

S. D. Ireland Brothers Corporation

1/2/25

 

CMGC – Construction Manager General Contractor

Construction contract

Contractor 

Award Amount 

Award Date 

Executed date

Springfield IM091-3(83) CMGC RFP  TBD TBD

TBD 

TBD

 

Design – Build/ Progressive Design Build 

Construction Contract Contractor Award Amount Award Date
Lyndon IM091-3(53) PDB- RFP  TBD TBD TBD
Lyndon IM091-3(53)- DB- RFP Cancelled 1.18.2024 Cancelled- 1.18.2024 Cancelled-1.18.2024
Lyndon IM91-3(53)- DB- RFQ

 Engineers Construction, INC.

J.A McDonald Inc. 

N/A 12/22/2022

Design, Build, Own, Operate and Maintain

Construction Contract Contractor Award Amount Award Date
Statewide National Electric Vehicle Infrastructure (NEVI) RFP Award Notification  Please see award notification  Please see award notification 
Statewide National Electric Vehicle Infrastructure (NEVI)_ RFQ  Shortlist Notification  N/A 06/05/2024

Contractor Input During Design

Construction Contract Contractor Award Amount Award Date
Chester BO 1442(39) Shortlist Notification  N/A 05/08/2024