All Agency lead projects and projects with a VTrans Residential Engineer shall utilize the VTrans Construction EPSC Protocol to aid in the development of the EPSC plan with respect to environmental impacts. Follow the linked documents below starting with the section most appropriate to your discipline.
Designers (Preconstruction Phase): Project development prior to bid letting
-
All Designers
-
Consultants
Contractors (Construction Phase): To include Contractor consultants developing EPSC plans
Off Site Activity see:
Municipal Assistance Section (MAS) Stormwater Flow Chart: